- Support Services
- Broad Run HS Classroom Addition
Construction Services
Page Navigation
- Overview
- Under Construction
- Banneker Elementary School Renovation & Addition
- Park View High School Replacement Project
- Safety & Privacy in School Restrooms
- Douglass School Renovations
- Bidding and Prequalification
- Contract Awards
- Current Solicitations
- Project Management Team
- Design Team
- Photo of the Month
- Facility Assessment Studies
- Completed Projects
- Adopted CIP Documents
- Directions to LCPS Construction Office
- Sustainability Efforts
-
Broad Run High School Classroom Addition & Renewal
LCPS Senior Project Manager: Hal Broadhurst
LCPS Project Manager: Svain Ulvedal
Contractor: Henley Construction, Gaithersburg, MD
Architect: Stantec, Reston, VA
Civil Engineer: J2 Engineers, Inc., Manassas, VACIP Funding - FY2015
Construction Began – Spring of 2015
Project Completion – Summer 2016The Broad Run High School classroom addition and renewal project will be completed by the start of the 2016-17 academic year. The addition at Broad Run High School will involve the construction of ten classrooms to replace the existing nine trailers on site, as well as expansion of the cafeteria, two resource spaces, a health room, an orchestra room, and improvements to the auditorium and overall student circulation.
The project will also include a new senior parking lot to replace the existing parking lot removed for the classroom addition. The school’s bus loop will be extended and include ADA (Americans with Disabilities Act of 1990) improvements, and the onsite fuel facility for LCPS and County-owned vehicles will be removed.
Improvements associated with the athletic program include drainage improvements; ticket booth upgrades; new or renovated press boxes for the softball, baseball, and stadium fields; new restroom facilities; a team building; ADA compliant paths; stadium synthetic turf and track replacement, and a new shot put area. Grading of the band practice area, parking lot expansion and resurfacing will also be a part of the project scope.
Due to heavy equipment operations and construction vehicles, all drivers should be aware of new traffic patterns and alternate routes near the property. As this is an active construction site, access is controlled and requires permission from the LCPS Division of Construction Services.
If you have questions regarding the project or after-hours work at this site, please contact the Office of Construction Services at (571) 252-1161.Click here for past images. C l i c k o n t h e " i " f o r c a p t i o n s .
November 2016